Building a school   Building a future

 

First Classroom Block (Dec 06)

Other reports:  Back | Next

Photographs showing building progressing well.

Wall construction
Construction of the first classroom block at Got Matar Secondary School.

Wall construction
The block will consist of 4 classrooms, with a total area of almost 300 square metres.

School wall construction
The construction is at the slab stage.

Adding reinforcing steel
Reinforcing steel being set in the shuttering before casting a wall-top beam on which the roof will be set.
 

Building materials
The Ministry of Public Works is very strict and insists on quality material.

Vegetable plot
The group of volunteers that has been helping Got Matar Secondary school is also planning a school vegetable garden like this one on their own farm.

Clearing the site
Clearing the school site.

Perimeter fence preparation
The start of the school compound fence.

Home | Oct 06 | Nov 06 | Dec 06 | Dec 06 (2) | Jan 07 | Feb 07 | Mar 07 | Apr 07 | May 07 | July 07 | Aug 07 | Sep 07 | Nov 07 | Dec 07 | Jan 08 | Feb 08 | Mar 08 | May 08 | Aug 08 | Oct 08 | Nov 08 | Apr 09 | Oct 09 | Nov 09 | Dec 09 | Feb 10 | Apr 10 | May 10 | Jun 10 | Aug 10 | Sep 10 | Oct 10 | Dec 10 | Mar 11 | Oct 11 | Mar 12